Haward Technology Middle East


Mr. Yasser AbdelAziz B.Sc., is a Senior Petroleum Operation & Well Site Engineer with over 15 years of Industrial Experience in Oil, Gas, and Petrochemical industries. He is currently working with the Gulf of Suez Petroleum Company (GUPCO) as the Department Head for the North Central Engineering Division where he is in charge of major activities in the Exploration, Production, and Processing of Crude Oil and Gas.
 
 

His responsibilities include the supervision of the Well Drilling & Completion activities according to the Well Integrity Standard, the maintenance of Well Integrity and Achievement of Reservoir Target, the Assessment & Improvement of Wells Performance, the development of plans for solving well problems (such as Water Production, Scale, Corrosion and Production Decline), the implementation of varieties of Rig / Rigless Works according to production target and business plan. He is also overseeing the review of Job Designs and the implementation of these jobs safely and correctly with offshore production team and service companies.

Mr. Yasser also worked with the Production Engineering Department managing the daily operation Ef ficiency of High rate Oil and High Volume Water Injection Wells, the Chemical Injection Rate Control, the switching of wells between Production and Test Separators or Multi-phase Flow Meters, the Well Test Analysis, the monitoring and posting of Operating Conditions for Wells on Satellite Platforms, and the optimization of Gas Lift Injection Rate for maximum field production. He played a key role as the company's Representative for the chemical treatments of wells.

Earlier in his career life, he started honing his skills and knowledge working with the District Engineering Division. He took charge of the Quantitative and Qualitative Analysis of Well Logs, the Well Testing & Analysis for Production and Water Injection Wells, the preparation for Stimulation, Work Over, Well Test, Wire Line and Perforation programs and Well Performance Evaluation, the troubleshooting and unloading of producing wells at the optimum flowing conditions, and at the same time developing recommendations for Water shutoff using MPBT, Casing Patch, or Cement Squeeze, Perforation and Re-perforation utilizing rig ( TCP gun ) or without rig ( through tubing gun ), Rig and Rigless Recompilation, Stimulation and Tubing Cleaning, and Mechanical WorkOvers.

Mr. Yasser has Bachelors and Masters Degrees in Petroleum Engineering.

 
     

footer
 
 

©2009  Haward Technology Middle East